Elements and Performance Criteria
- Prepare for blasting
- Permits/ licences are obtained and approved warning signs installed and prominently displayed according to legislative requirements.
- Property manager and relevant controlling authorities are notified of blasting plans and timing as required by legislation.
- The area where the charges are to be used is cleared of stones and other potential missiles.
- The blast site is cleared and made safe prior to charges being placed.
- All explosive products are placed at the required safety distance from any identified hazards.
- Appropriate holes are drilled/dug to place the charge(s) in line with blasting plans.
- Drilling/digging equipment is removed to the prescribed safe distance in accordance with Australian Standards, Acts and Regulations.
- Neighbours and members of the public likely to be concerned or disturbed by shock effects are advised of the blasting program.
- Prepare explosives
- Quantities of explosives components required are calculated to match the application and prevailing conditions.
- Required explosives are assembled on site, or an explosives mix (of homogenous composition) is calculated precisely to ensure minimum residual mix to be destroyed, and is prepared in accordance with defined requirements.
- Required fusing and detonating components are assembled to match the established explosive requirements in preparation for blasting.
- Place charges
- Explosives elements are placed in holes or packed using safe working procedures and methods and in accordance with Australian Standards, Acts and Regulations.
- All holes are stemmed and tamped prior to the attachment of the firing system to maximise safety to all personnel and the efficiency of the blasting.
- Electrical firing circuits or fire fuses are checked for continuity and/or earthing as required.
- All extraneous materials are cleared from the site to safe distances in accordance with enterprise standards.
- Routine re-checks of the site and surrounds are performed to ensure that no non-essential personnel are endangered.
- Blasting mats or other control devices are placed as appropriate according to the blasting plan.
- Blast area is guarded according to legislative requirements and enterprise practices.
- Fire charges
- Prescribed warning notification procedures are carried out in accordance with enterprise and industry standards.
- The blasting site is re-checked to ensure correct placement of explosives and ensure that all safety procedures have been implemented according to supervisor or shot firer's instructions.
- Warning signals including audible and visual signals are issued to ensure that the site is clear.
- Firing procedures are initiated through manual or electric firing systems.
- Conduct post-firing procedures
- Charges are counted as they fire or are inspected safely post blasting to ensure that misfires are readily identified prior to all clear signals being given.
- Misfire procedures are implemented after prescribed timing and/or practice drills conducted using water jets or additional charges in accordance with Australian Standards, Acts and Regulations.
- Site checks are carried out to ensure that the site is safe and the all-clear signal is given in line with industry practice and legislative requirements.
- Surplus, unserviceable and defective explosives and detonators are destroyed or discarded or stored in line with prescribed procedures and in consideration of the environmental impact.
- Accurate records are completed and kept in line with enterprise and legislative requirements.