Elements and Performance Criteria
- Prepare for work on a low volume irrigation installation site
- 1.1 The required materials,tools and equipment are identified according to lists provided and/or supervisor's instructions
- Techniques used when loading and unloading materials demonstrate correct manual handling and minimise damage to the load and the vehicle
- Suitable personal protective equipment (PPE) is selected and checked prior to use
- OHS hazards are identified and reported to the supervisor
- Prepare the site
- Install irrigation components
- System components are assembled and connected according to plan, with joints completed and tested
- Complete installation tasks
- The site is restored and waste material is removed from the site and disposed of in an environmentally aware and safe manner according to enterprise work procedures
- Tools, equipment and machinery are cleaned, maintained and stored according to enterprise work procedures
- System is connected to water supply
- System is flushed and commissioned as directed
- Operating faults are identified and reported to supervisor and/or corrective actions taken