Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Perform pre-start checks for gravity fed irrigation system
  2. Start up and inspect system
  3. Shut down system based upon irrigation indicators

Required Skills

Required skills

identify hazards and implement safe work procedures

set up pipes system equipment and outlets

start up the system

use syphons

check pressure at the headworks and control valves

carry out running repairs on irrigation delivery and drainage systems

carry out shut down procedures

identify adverse environmental impacts of irrigation activities and appropriate remedial action

implement OHS and environmental policies and procedures relating to the operation of gravity fed irrigation systems

use literacy skills to read interpret and follow organisational policies and procedures follow sequenced written instructions record accurately and legible information collected and select and apply procedures for a range of tasks

use oral communication skillslanguage competence to fulfil the job role as specified by the organisation including questioning techniques active listening clarifying information and consulting with supervisors as required

use numeracy skills to estimate calculate and record routine workplace measures

use interpersonal skills to work with and relate to people from a range of cultural social and religious backgrounds and with a range of physical and mental abilities

Required knowledge

general irrigation methods for gravity fed irrigation systems

main components of gravity fed irrigation systems

pump types used in gravity fed irrigation systems and their operation

environmental impacts of irrigation using water from any ground or underground source

inspection procedures

soilplantwater relationships

water requirements of plantscrops consistent with sound environmental management

shutdown sequence

OHS environmental and enterprise policies and procedures relating to the operation of gravity fed irrigation systems

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence is required in the process of operating gravity fed irrigation systems The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following

read and follow operations manual and irrigation schedules

use prestart checks

operate and inspect the system

check pressure at the headworks and control valves

carry out running repairs on irrigation delivery and drainage systems

shut down in response to irrigation indicators

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances