Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Apply commonly used symbols and abbreviations
  2. Locate and identify key features on a site plan
  3. Mark out and peg the site from a plan
  4. Identify required components for installation

Range Statement


Performance Evidence

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

interpret scale and specifications from plans and drawings

interpret symbols and abbreviations used on plans

mark out boundaries and infrastructure position from a plan

recognise and mark out features on a site from a plan

translate documented requirements into on-site activities and site and structural features from two-dimensional to three-dimensional formats

use basic industry calculations