Elements and Performance Criteria
- Develop and implement construction procedures
- Employment procedures and contract management procedures are developed
- Procedures for controlling and recording site deliveries are established
- Procedures for recording the hire of plant and equipment are determined
- OHS procedures are established, including risk assessment
- Client, authorities and agencies are notified of the schedule of works
- Procedures for dealing with environmental issues associated with construction work are determined
- Interpret the sprinkler irrigation systemdesign for the site
- Organise resource requirements
- Tasks and timelines are nominated with resources required for each
- Labour requirements are organised
- Parts and equipment are delivered to the site and checked
- Equipment and machinery is selected and maintained
- Jobs and tasks are allocated to the work team
- Safety induction is carried out for the task and site
- Supervise installation and construction
- Plan is interpreted and installers are supervised and work is monitored to conform to the plan.
- Components are assembled and connected according to the plan, and joints are completed and tested according to manufacturer specifications.
- Fittings and valves are fitted and adjusted to the requirements of the installation plan, and all joints are secured according to enterprise guidelines.
- Pumping system is installed and tested
- Complete installation work and test components
- Commission system
- Operating faults are identified and corrective actions taken to meet design specifications
- Testing/monitoring equipment is calibrated to manufacturer’s specifications
- Pressure testing is carried out and compared to specifications
- Adjustments are made as required
- The system is handed over in compliance with design specifications