Elements and Performance Criteria
- Develop and implement construction procedures
- Employment procedures and contract management procedures are developed
- Procedures for controlling and recording site deliveries are established
- Procedures for recording the hire of plant and equipment are determined
- OHS procedures are established, including risk assessment
- Client, authorities and agencies are notified of the schedule of works
- Procedures for dealing with environmental issues associated with construction work are determined
- Interpret the surface irrigation system design for the site
- Organise resource requirements
- Tasks and timelines are nominated with resources required for each
- Labour requirements are organised
- Parts and equipment are delivered to the site and checked
- Equipment and machinery is selected and maintained
- Jobs and tasks are allocated to the work team
- Safety induction is carried out for the task and site
- Supervise installation and construction
- Trenches are excavated to specifications
- Earth works are carried out
- Bay outlets and gates are constructed
- Pipes are laid and joined
- Fittings and valves are fitted and adjusted to the requirements of the installation plan, and all joints are secured according to enterprise guidelines
- Pumping system is installed and tested
- Complete installation work and test components
- Commission system
- The system is started up and flushed
- Valves are set allowing for water to targeted areas
- Operating faults are identified and corrective actions taken to meet design specifications
- Testing/monitoring equipment is calibrated to manufacturer’s specifications
- Adjustments are made as required
- The system is handed over in compliance with design specifications