Elements and Performance Criteria
- Develop a maintenance program for a moving sprinkler irrigation system
- Maintenance requirements for irrigation components and structures are established
- Maintenance requirements for the irrigation site are established
- The frequency of maintenance activities required are determined and a schedule is developed
- Maintenance activities are costed out in terms of required staff, materials and equipment
- OHS risks associated with the maintenance program are assessed and suitable controls implemented
- The environmental impacts of maintenance activities are minimised
- A system for reporting maintenance activities is developed
- Supervise maintenance of moving sprinkler irrigation components
- Maintenance checklists are developed for irrigation components
- Component operation is systematically monitored and operating faults are identified and appropriate action taken
- Abnormal operation or frequent and recurring breakdowns are identified, investigated and maintenance organised as required
- Situations requiring expert advice are identified and specialist assistance sought in accordance with site procedures
- Equipment condition is routinely reviewed to ensure and maintain efficient operations
- Supervise maintenance of moving sprinkler irrigation structures
- Maintenance checklists are developed for irrigation components
- Structures are inspected as necessary to locate and evaluate defects
- Appropriate repair methods are identified to ensure defect is repaired effectively
- Structures are repaired or replaced according to requirements
- Materials required for job are identified and organised as required to enable appropriate maintenance of components
- Testing equipment is maintained
- Complete records of irrigation system maintenance