Elements and Performance Criteria
- Develop and implement construction procedures
- Employment procedures and contract management procedures are developed
- Procedures for controlling and recording site deliveries are established
- Procedures for recording the hire of plant and equipment are determined
- OHS procedures are established, including risk assessment
- Client, authorities and agencies are notified of the schedule of works
- Procedures for dealing with environmental issues associated with construction work are determined
- Organise resource requirements
- Tasks and timelines are nominated with resources required for each
- Labour requirements are organised
- Parts and equipment are delivered to the site and checked
- Equipment and machinery is selected and maintained
- Jobs and tasks are allocated to the work team
- Safety induction is carried out for the task and site
- Interpret the irrigation drainage systemdesign for the site
- Carry out preparatory work
- Supervise construction of the drainage system
- Trenches are excavated to specification
- Earth works are carried out
- Drainage structures are constructed
- Pipes are laid and joined
- Fittings and valves are fitted and adjusted to the requirements of the installation plan, and all joints are secured according to enterprise guidelines.
- Pumping system is installed and tested
- Commission the irrigation drainage system
- Rehabilitate the works area