Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Plan and prepare for installation
  2. Set out the site for path construction
  3. Undertake ground preparation
  4. Lay surface aggregate materials
  5. Make good the site

Range Statement


Performance Evidence

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

plan and prepare for installation and site safety

read and interpret site plans

undertake ground preparation for the path

lay base material and surface aggregate materials

set the path out

reinstate site at completion of work