Elements and Performance Criteria
- Plan and prepare for installation
- Required workplace information is interpreted and confirmed with supervisor.
- Tools and equipment are prepared and used according to supervisors' instructions.
- The quantity and quality of materials are checked to ensure they conform to the requirements of the job.
- OHS hazards are identified, risks assessed and reported to the supervisor.
- Personal Protective Equipment (PPE) and clothing is selected, used and maintained.
- Plans for public risk protection are developed in liaison with the supervisor according to statutory obligations and enterprise guidelines.
- The potential for environmental damage are assessed and measures are planned to avoid or control/minimise those impacts.
- Set out the site for path construction
- The location of the proposed path is marked out according to the site plan and contract documents or supervisors instructions.
- The marked out area is checked with the supervisor for compliance with the site plan, contract documents and OHS requirements.
- Public risk protection measures are put in place and used throughout the course of construction work.
- Undertake ground preparation
- The area is cleared of debris and excavated to base level and soil and waste materials are relocated or disposed of as directed.
- Measures to avoid environmental impacts are put in place prior to commencement of work.
- Base material is placed and compacted to the required finished level.
- Work carried out conforms to site plan, contract documents and instructions.
- Set out work is checked at regular intervals with supervisor.
- 3Edge restraints, where required, are installed according to site plan and instructions.
- Install drainage structures as directed.
- Site problems and discrepancies are reported to the supervisor.
- Lay surface aggregate materials
- Make good the site