Elements and Performance Criteria
- Plan and prepare work
- Plans and specifications are interpreted.
- The quantity and quality of materials are checked for conformation to design drawings and specifications.
- Tools and equipment are selected and checked for serviceability according to industry practice.
- Personal Protective Equipment (PPE) is selected, used and maintained according to procedures.
- Occupational Health and Safety (OHS) hazards are identified, risks assessed, and controls are implemented.
- Position the structure and prepare the profile and footings
- Services are identified and located from site plans.
- The position of the structure is marked out according to design drawings and specifications.
- Profiles are established to conform to the tolerances nominated within the design drawings and specifications.
- Footings are excavated and prepared according to the type of structure to be erected.
- Prepare and cut timber components
- Components are prepared for assembly to the requirements contained in the design drawings and specifications.
- The length of components and the positions of cuts and joints are marked out with a pencil according to designated specifications in design drawings.
- Cutting tools are selected, used and maintained according to manufactures recommendations and OHS specifications.
- Components are cut, checked out and drilled accurately in preparation for joining and assembly.
- Assemble and erect structure
- Timber components are fixed, joined or assembled into position and fixed into place according to design drawings and specifications.
- Remaining components are installed and fixed into position according to design drawings and specifications.
- Structure is finished off to ensure all components are secure and complete.
- Coatings are applied according to specifications and manufacturer's recommendations.
- Check quality of work and clean up site