Elements and Performance Criteria
- Survey the construction site
- Surveying equipment is set up and used according to industry standards.
- Existing levels are surveyed and temporary benchmark established. Details are recorded accurately and legibly according to industry standards.
- New levels are set according to specifications and pegs placed according to industry convention.
- Contour map with reduced levels and a cross section is developed and drawn using accepted industry symbols and mapping conventions.
- Prepare for construction work
- Enterprise work team, contractors and design consultants are identified and, where required, engaged.
- Work tasks are scheduled in a logical, timely and effective manner in consultation with the supervisor.
- Materials required are estimated and costed according to accepted industry practice and ordered.
- Plans for the new construction profile are obtained or developed.
- Set out site for construction
- Excavate the construction site
- Excess soil is removed and the construction site cleared with the stockpile being placed in a designated area according to enterprise work procedures.
- The base is graded to the level and slope specified in the base design.
- The base of the profile is prepared over the entire site according to the construction plan.
- Sub-surface irrigation system components and fittings are installed to the required depth and design specified in the construction plan.
- Install drainage system.
- Install soil profile
- Quantities of material required are calculated and measured according to the construction plan.
- Soils and growing media are selected for sustainable use and according to the construction plan.
- Each profile layer is installed and compacted to reflect the final contour.
- The interface between profile layers is uniform and unbroken according to the construction plan.
- Soil amendments are prepared and implemented.
- The finishing soil surface is given a final levelling and consolidated, ready for planting, according to the construction plan and enterprise work procedures.