Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare for soil profile construction
  2. Prepare equipment for soil profile construction
  3. Undertake soil profile construction
  4. Restore the site after drainage and irrigation installation

Range Statement


Performance Evidence

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

clean, maintain and store turf construction machinery and equipment

follow procedures and sequence work during the course of the construction

use a range of turf construction machinery and equipment

work in a team on a turf construction project