  1. Plan for construction activities
  2. Survey and lay out the construction site
  3. Prepare for construction work
  4. Set out site for construction
  5. Excavate the construction site
  6. Install drainage system
  7. Install soil profile

Range Statement


Performance Evidence

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

determine turf construction requirements from plans

implement a turf construction project

interpret existing site and construction plans and specifications

organise work and use tools and equipment for turf construction project


Knowledge Evidence

The candidate must demonstrate knowledge of:

principles and practices for constructing turf playing surfaces

environmental implications associated with construction and excavation activity, drainage and irrigations systems, soil amendments and waste disposal procedures

materials, tools, equipment and machinery available to the enterprise for construction of soil profiles, including soil amendments and base construction materials

practical understanding of surveying principles and techniques

range of construction methods that may be used to construct soil profiles for high performance turf surfaces, and the association of construction methods with site limitations, environmental implications, and end use of the turf surface

soil testing techniques and the application of results to the construction process