Elements and Performance Criteria
- Plan for construction activities
- The construction site for high performance turf playing surfaces and the construction method are identified according to the site and construction plans and enterprise work procedures.
- Soil tests of existing soil are undertaken using representative samples, and according to testing instrument instructions and enterprise work procedures.
- Locations and layout of services and utilities are identified, depths checked against the site or construction plan, and discrepancies are reported to the supervisor and the relevant authorities.
- History of site is determined and taken into account in planning construction details.
- Likely consequences of site aspect, features and run-off from adjacent sites are determined and incorporated in site and construction plans.
- Occupational Health and Safety (OHS) hazards are identified, risks assessed, controls implemented and reported to the supervisor.
- Suitable safety equipment and Personal Protective Equipment (PPE) are selected, used and maintained.
- Survey the construction site
- Surveying equipment is set up and used according to industry standards.
- Existing levels are surveyed and temporary benchmark established. Details are recorded accurately and legibly according to industry standards.
- New levels are set according to specifications and pegs placed according to industry convention.
- Contour map with reduced levels and a cross section is developed and drawn using accepted industry symbols and mapping conventions.
- Prepare for construction work
- Enterprise work team, contractors and design consultants are identified and, where required, engaged.
- Work tasks are scheduled in a logical, timely and effective manner in consultation with the supervisor.
- Materials required are estimated and costed according to accepted industry practice and ordered.
- Plans for the new construction profile are obtained or developed.
- Set out site for construction
- Symbols and terminology are interpreted to ensure the concept of the construction plan is clearly understood according to industry practice.
- Boundaries and features contained in the site and construction plans are checked and verified against the actual site and existing features.
- Finishing levels, provision for drainage and irrigation, and drainage head of the site are identified and checked against the construction plan to ensure nominated levels are workable.
- Measurements are checked against the construction plan, the construction area is pegged out, and variances are notified to the supervisor according to enterprise work procedures.
- Excavate the construction site
- Excess soil is removed and the construction site cleared with the stockpile being placed in a designated area according to enterprise work procedures.
- The base is graded to the level and slope specified in the base design.
- The base of the profile is consolidated to achieve uniform compaction over the entire site according to the construction plan.
- Sub-surface irrigation system components and fittings are installed to the required depth and design specified in the construction plan.
- Install drainage system
- Install soil profile
- Quantities of material required to be spread over the designated area are calculated and measured according to the construction plan.
- Equipment is calibrated according to manufacturer's guidelines to distribute the required amount of material over the designated area.
- Each profile layer is compacted to reflect the final contour.
- The interface between profile layers is uniform and unbroken according to the construction plan and enterprise work procedures.
- Soil amendments are prepared according to enterprise work procedures, mixed thoroughly and applied evenly over the designated area.
- The finishing soil surface is given a final levelling and consolidated, ready for planting, according to the construction plan and enterprise work procedures.