Elements and Performance Criteria
- Prepare to work in bulk materials storage area
- Work undertaken is interpreted from the work program where necessary, and confirmed with the management.
- Occupational Health and Safety (OHS) hazards are identified, risks assessed and suitable controls implemented.
- Suitable personal protective clothing and equipment is selected, used and maintained.
- Tools and equipment suitable for the work to be undertaken are selected, checked, and maintained if necessary.
- Environmental implications of undertaking work in the bulk materials storage area are identified, likely outcomes assessed and if necessary responsible action taken.
- Sample bulk materials for testing
- Representative samples of bulk materials are taken for testing in line with the requirements of the bulk materials storage program.
- Sampling is undertaken safely, following the prescribed guidelines for the activity.
- Representative bulk materials samples are prepared for dispatch, accurately and clearly labelled, and packaged according to the guidelines of the organisation and the analysing body.
- Samples are dispatched to the analysing body, according to the requirements of the bulk materials storage program.
- Move bulk materials into and out of storage
- Bulk materials for handling and storage are correctly identified from the written or verbal instructions.
- Bulk materials are segregated according to type, variety and quality characteristics according to the requirements of the organisation as stated in the bulk materials storage program.
- Measures are taken to minimise insect and weed infestation and contamination during the movement of the bulk materials.
- Bulk materials are regularly checked for insect infestation and contamination during movement according to enterprise requirements.
- Any storage and handling equipment that is used is thoroughly cleaned after emptying, and dismantled if necessary, according to the procedures of the organisation and the nature of the equipment.
- Bulk materials are moved into and out of storage according to the procedures of the organisation, and following the prescribed OHS procedures.
- Silo types and handling equipment are selected for each bulk material type in relation to their storage characteristics and flow properties and according to the requirements of the bulk materials storage program.
- Suitable measures are implemented to minimise the affect of desiccant dusts on the flow properties of bulk materials.
- Records are clearly and accurately updated and stored as and when required by the bulk materials storage program.
- Repair and maintain storage facility
- The need for repairs to the facility is identified through observation or instruction.
- Maintenance and repairs are conducted according to the requirements of the organisation and following the prescribed OHS procedures and taking into account environmental considerations.
- Completed maintenance records and other appropriate information are documented in accordance with enterprise requirements.
- Workshop and work areas are cleaned and maintained to OHS and enterprise requirements.
- Maintenance and repairs, damage, malfunctions or irregular performance in machinery, tools and equipment are reported in line with organisational requirements.
- Tools and equipment are cleaned, secured and stored in line with OHS and organisational requirements.