Elements and Performance Criteria
- Select and use tools and equipment
- Select and use nuts, bolts, screws, washers and fasteners
- Nuts, bolts, screws, washers and fasteners are identified and selected to meet the job requirements as stated in the materials list
- Nuts, bolts, screws, washers and fasteners are fitted in the required number to the designated positions stated in the materials list and associated drawings
- Size and position of holes drilled complies with drawing specifications
- Install engine and drive train components
- Materials list and drawings are correctly read and interpreted
- Parts/components are matched with the materials list for the job specification
- Parts/components are positioned and secured as per the relevant drawings/instructions
- Specified nuts, bolts and screws are tensioned to the specification stated in the standard operating procedures
- Installed components and sub-assemblies are inspected and checked for quality and specification
- Workflow and production schedule are recorded and maintained
- Route service lines