Elements and Performance Criteria
- Prepare the assembly/pod for installation of refrigeration system kit
- Install refrigeration system kit
- Installation information is accessed and interpreted from job specification and manufacturer specifications
- Installation is completed without causing damage to any organisation property or vehicle
- Appropriate fittings/materials are assembled for installation.
- Refrigeration systems are installed using appropriate tools and techniques
- Installation is tested prior to placing in service and results are recorded
- Gas and commission refrigeration system
- Gassing information is accessed and interpreted from appropriate manufacturer specifications, industry codes of practice and relevant legislation
- System is gassed and performance tested using approved methods, tools and equipment and in accordance with organisation procedures
- System installation is verified as operational in accordance with specifications