Elements and Performance Criteria
- De-gas refrigeration system
- Activities are carried out according to OHS and organisation requirements
- De-gassing requirements are accessed and interpreted from appropriate manufacturer specifications, industry codes of practice and relevant legislation
- System is de-gassed using approved recovery unit and in accordance with organisation procedures
- Remove refrigeration system
- Removal is completed without causing damage to any organisation property or vehicle
- Removal information is accessed and interpreted from job specification and manufacturer specifications
- Fittings and materials are disassembled for removal in accordance with manufacturer and safety requirements
- Refrigeration system is removed using appropriate tools, equipment and techniques
- Replace refrigeration system
- Gas and commission refrigeration system
- Gassing information is accessed and interpreted from appropriate manufacturer specifications, industry codes of practice and relevant legislation
- System is gassed and performance tested using approved methods and equipment and in accordance with organisation procedures
- System installation is verified as operational in accordance with specifications