Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Interpret installation plan
  2. Obtain component parts, plant and/or equipment
  3. Prepare the work site
  4. Conduct installation of parts equipment, fixtures and/or extra low voltage wiring
  5. Verify installation

Required Skills

This describes the essential skills and knowledge and their level required for this unit

Required skills

speak clearly and directly in order to ensure worksite safety and compliance

apply teamwork to a range of situations to complete work tasks on time to required standards

solve problems particularly in teams in order to meet performance indicators

show initiative in adapting to changing work conditions or contexts particularly when working across a variety of work areas

access interpret and apply information on relevant organisation policies procedures and instructions particularly to the installation of pieces of plant or equipment

manage time when planning preparing and organising work priorities

take responsibility for organising own work priorities

Required knowledge

relevant Occupational Health and Safety and Environmental legislation regulations standards and codes of practice and organisation policies and procedures needed to carry out work in a manner which ensures the safety of people equipment and the environment

methods for conducting the installation of parts equipment fixtures andor extra low voltage wiring

operation of systems and components

organisational supplyreplenishment systems and processes for materials equipment and tools

types of tools and equipment and procedures for their safe use operation and maintenance

environmental protection requirements relating to the disposal of waste material

established communication channels and protocols

problem identification and resolution techniques

procedures for the recording reporting and maintenance of workplace records and information

Evidence Required

The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria Required Skills and Knowledge the Range Statement and the Assessment Guidelines for this Training Package

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the following is essential

compliance with relevant legislation regulations standards codes of practice and established safe practices and organisation policies and procedures for installing plant equipment or systems

maintaining a working knowledge of current organisation inventory procedures

working and communicating effectively and positively with others involved in the work

applying within authority the requirements of the job or work role in relation to

Installing plant equipment andor systems effectively

preparing for verification of installation

performing tests or trials

preparing reports of results

achieving work quality goals

completing work area housekeeping requirements including the documentation of project activity and process outcomes

modify activities to cater for variations in organisation context and environment

Context of and specific resources for assessment

assessment of the competency should take place in a safe working environment in a passenger motor vehicle manufacturing plant or simulated environment using toolsequipmentmachinery required for the production process without undue disruption to the production process

assessment is to occur under standard and authorised work practices safety requirements and environmental constraints

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge The following examples are appropriate for this unit

assessment methods must confirm consistency and accuracy of performance over time and in a range of organisation relevant contexts together with application of underpinning knowledge

assessment methods must be by direct observation of tasks and include questioning on underpinning knowledge to ensure its correct interpretation and application

assessment may be applied under project related conditions real or simulated and require evidence of process

assessment must confirm a reasonable inference that competency is able not only to be satisfied under the particular circumstance but is able to be transferred to other circumstances


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts.

OHS requirements may include:

Legislation and regulations, organisational safety policies and procedures and may include: the use of personal protective equipment and clothing, rescue services, fire fighting organisation and equipment, first aid equipment, hazard and risk control and elimination, systems covering the use of hazardous materials and substances and manual handling procedures including lifting and carrying.

Organisationrequirements may include:

access and equity principles and practices

environmental management (waste disposal, recycling and re-use guidelines)

emergency and evacuation procedures

equipment use procedures

ethical standards

legal obligations

maintenance and storage procedures

OHS requirements

organisational and site guidelines

policies and procedures relating to own role and responsibility

procedural manuals

quality assurance guidelines

quality and continuous improvement processes and standards

recording and reporting guidelines.

Installation of plant, equipment or systems may include:

plant

equipment

systems or components thereof, required in the automotive development/ manufacturing industry.

Instructions may include:

workplace procedures relating to the use and operation of tools and equipment

departmental requirements

workplace instructions, including job sheets, plans, specifications, drawings and designs

workplace procedures relating to reporting and communications

manufacturers' instructions for the use of equipment and materials.

Installation is checked may include:

tests to ensure the correct operation of plant, equipment, system and/or components. Tests are conducted in accordance with manufacturers' specifications, industry standards and may include tests to establish compliance with relative industry standards or to establish performance limits of plant/ equipment/systems. Tests are generally predetermined.