Elements and Performance Criteria
- Plan and prepare
- Activities are carried out according to OHS and organisation requirements
- Work instructions, including plans, specifications, quality requirements and operational details are obtained, confirmed and applied
- Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability and any faults are rectified or reported prior to commencement
- Materials appropriate to the work application are identified, obtained, prepared and located ready for use
- Shift engine
- Engine is hot tested
- Engine is mounted in the engine testing cradle
- Services are connected to the engine simulating normal operating conditions
- Engine is brought to hot operating conditions
- Computerised/keypad aided and manual/sensory tests are conducted on all operating facets of the engine against designated performance specifications
- Minor modifications are carried out in accordance with organisation procedures
- Results of all tests are recorded and documented
- Engine is designated as conforming or requiring rectification, labelled and prepared for transfer to assembly line or engine rectification area respectively
- Clean up