Elements and Performance Criteria
- Plan and prepare
- Activities are carried out according to OHS and organisation requirements
- Work instructions, including relevant inspection reports and forms and quality requirements are obtained, confirmed with appropriate personnel and applied
- Tools and equipment selected are consistent with the requirements of the job, checked for serviceability and faults are rectified or reported prior to commencement
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use
- Assess paintwork damage/defect
- Repair paintwork damage/defect
- Damaged or defective area is prepared for repair
- Adjoining areas to the damaged/defective area are protected from the repair work procedures
- Paint repair equipment and materials are selected and applied to damaged/defective areas
- Drying method is selected and applied
- Damaged or defective area is repaired to specifications
- Documentation is completed outlining nature of problem, work conducted and outcome, in accordance with organisation requirements
- Repaired vehicle is processed for inspection and returned to production sequence
- Clean up