Elements and Performance Criteria
- Plan and prepare
- Activities are carried out according to OHS and organisation requirements
- Work instructions, including relevant inspection reports and forms and quality requirements are obtained, confirmed with appropriate personnel and applied
- Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement
- Materials appropriate to the work application are identified, obtained, prepared and located ready for use
- Assess paint line flow
- Paint line sterile environment is monitored and maintained
- Flow of paint lines is checked for inconsistencies
- Paint arriving from the supplier is checked for batch accuracy and viscosity prior to adding to the paint line
- Paint viscosity is regularly checked for consistency
- Forward planning of paint supply and production requirements is monitored to ensure steady flow or smooth transition to next colour.
- Remedy paint line production problems
- Production line problems are assessed and cause identified
- Cause of problem is analysed and rectified
- Paint line procedures are reassessed to ensure identified problems are remedied and avoided in future production line procedures
- Documentation is completed outlining nature of problem, work conducted and outcome, in accordance with organisation requirements.
- Clean up