Elements and Performance Criteria
- Prepare to assemble bicycle
- Job requirements are determined from workplace instructions
- Bicycle manufacturer assembly specifications and the Australian Competition and Consumer Commission (ACCC) product safety standards relating to bicycles are accessed and interpreted
- Hazards associated with the work are identified and risks are managed
- Assembly tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability
- Work area is prepared and work is planned to minimise waste and use time efficiently
- Select components
- Fit, test and adjust components
- Components are fitted to bicycle frame according to assembly plan, manufacturer specifications, and safety and environmental requirements, and without causing damage to components or systems
- Components are lubricated and torque and tensions are adjusted according to manufacturer assembly specifications
- Assembled bicycle is inspected and tested for correct tension of components and operation, and adjusted as required according to workplace procedures
- Assembly is checked to ensure it complies with ACCC product safety standards
- Complete work processes
- Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
- Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures
- Prepare to assemble bicycle
- Job requirements are determined from workplace instructions
- Bicycle manufacturer assembly specifications and the Australian Competition and Consumer Commission (ACCC) product safety standards relating to bicycles are accessed and interpreted
- Hazards associated with the work are identified and risks are managed
- Assembly tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability
- Work area is prepared and work is planned to minimise waste and use time efficiently
- Select components
- Fit, test and adjust components
- Components are fitted to bicycle frame according to assembly plan, manufacturer specifications, and safety and environmental requirements, and without causing damage to components or systems
- Components are lubricated and torque and tensions are adjusted according to manufacturer assembly specifications
- Assembled bicycle is inspected and tested for correct tension of components and operation, and adjusted as required according to workplace procedures
- Assembly is checked to ensure it complies with ACCC product safety standards
- Complete work processes
- Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
- Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures