Elements and Performance Criteria
- Identify frame requirements and prepare to design and build bicycle frame
- Job requirements are determined from workplace instructions
- Customer requirements are discussed and confirmed
- Physical attributes of rider and his or her riding style are assessed using sizing cycle, observation and measurements
- Bicycle frame design principles and design are researched and component specifications checked
- Work plan and build instructions are prepared to use materials and time efficiently and minimise waste
- Design bicycle frame
- Frame is designed to meet customer measurements and requirements, using a bicycle computer-aided design (CAD) program or other means
- Frame tubing requirements are specified in terms of diameter and wall thickness to meet durability and user requirements
- Required parts and materials and their availability are determined
- Frame costs are documented and customer approval is obtained
- Order is placed with suppliers for frame materials, parts and components
- Prepare for frame building
- Build bicycle frame
- Tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability
- Frame building activities are carried out according to design drawing, work plan, and safety and environmental requirements
- Hazards associated with the work are identified and risks are managed
- Design drawing angles, measurements and frame alignment are checked throughout the building process and adjustments are made as required
- Paint and finish frame
- Frame is prepared for painting and finishing
- Paint or finish is prepared and applied according to job and customer requirements and workplace instructions
- Safety and environmental requirements, including the use of PPE and adequate ventilation during frame painting, are followed
- Visible paint defects are removed or repainted according to workplace procedures and quality requirements
- Complete work processes
- Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
- Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures
- Identify frame requirements and prepare to design and build bicycle frame
- Job requirements are determined from workplace instructions
- Customer requirements are discussed and confirmed
- Physical attributes of rider and his or her riding style are assessed using sizing cycle, observation and measurements
- Bicycle frame design principles and design are researched and component specifications checked
- Work plan and build instructions are prepared to use materials and time efficiently and minimise waste
- Design bicycle frame
- Frame is designed to meet customer measurements and requirements, using a bicycle computer-aided design (CAD) program or other means
- Frame tubing requirements are specified in terms of diameter and wall thickness to meet durability and user requirements
- Required parts and materials and their availability are determined
- Frame costs are documented and customer approval is obtained
- Order is placed with suppliers for frame materials, parts and components
- Prepare for frame building
- Build bicycle frame
- Tools and equipment, including personal protective equipment (PPE), are selected and checked for serviceability
- Frame building activities are carried out according to design drawing, work plan, and safety and environmental requirements
- Hazards associated with the work are identified and risks are managed
- Design drawing angles, measurements and frame alignment are checked throughout the building process and adjustments are made as required
- Paint and finish frame
- Frame is prepared for painting and finishing
- Paint or finish is prepared and applied according to job and customer requirements and workplace instructions
- Safety and environmental requirements, including the use of PPE and adequate ventilation during frame painting, are followed
- Visible paint defects are removed or repainted according to workplace procedures and quality requirements
- Complete work processes
- Final inspection is made to ensure work meets workplace expectations and bicycle is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
- Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures