Elements and Performance Criteria
- Prepare to install basic ancillary electrical system and components
- Job requirements are determined according to workplace instructions
- Manufacturer specifications and installation fitting instructions are sourced and interpreted
- Installation options are considered and those most appropriate to the circumstances are selected
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Install and test basic ancillary electrical system and components
- Electrical system and components are checked for correct application and damage
- Electrical equipment is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
- Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications
- Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and any problems detected as having been introduced during the installation process are rectified
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and vehicle or machinery is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures
- Workplace documentation is processed according to workplace procedures
- Prepare to install basic ancillary electrical system and components
- Job requirements are determined according to workplace instructions
- Manufacturer specifications and installation fitting instructions are sourced and interpreted
- Installation options are considered and those most appropriate to the circumstances are selected
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Install and test basic ancillary electrical system and components
- Electrical system and components are checked for correct application and damage
- Electrical equipment is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
- Installed system and components are tested for correct operation according to workplace procedures and manufacturer specifications
- Post-installation testing of other electrical systems is carried out according to workplace procedures to confirm correct operation, and any problems detected as having been introduced during the installation process are rectified
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and vehicle or machinery is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures
- Workplace documentation is processed according to workplace procedures