Elements and Performance Criteria
- Prepare for work
- Remove electrical and electronic units and assemblies
- Correct information is accessed and interpreted from manufacturer and component supplier specifications
- Electrical and electronic units and assemblies are removed using approved methods, tools and equipment
- Assistance from a licensed person is sought in relation to air conditioning and LPG/CNG/LNG systems and component removal
- Removal activities are carried out according to industry regulations and guidelines, workplace health and safety (WHS) legislation, and workplace policies and procedures
- Units and assemblies are handled and stored according to manufacturer and component supplier requirements
- Replace electrical and electronic units and assemblies
- Correct information is accessed and interpreted from manufacturer and component supplier specifications
- Electrical and electronic control units and assemblies are replaced using approved methods, tools and equipment
- Assistance from a licensed person is sought in relation to air conditioning and LPG/CNG/LNG systems and component replacement
- Replacement activities are carried out according to industry regulations and guidelines, WHS legislation and workplace policies and procedures
- Test and reprogram electrical and electronic units and assemblies
- Testing procedures on replaced electrical and electronic control unit and assemblies are carried out
- Options for diagnosing faults are identified and used, using appropriate tools and diagnostic techniques
- Checking and testing are achieved without causing damage to components or systems as a result of inappropriate testing procedures
- Faults are identified from test results and causes of faults are determined
- Diagnosis findings are reported according to workplace procedures, including recommendations for necessary repairs or adjustments
- Reprograming options are analysed and those most appropriate are selected
- Component replacement and programing procedures are carried out according to workplace procedures and manufacturer and component supplier specifications
- Post-repair testing is conducted and results are documented according to workplace procedures and relevant legislation
- Clean up work area and maintain equipment
- Material that can be reused is collected and stored
- Waste and scrap are removed following workplace procedures
- Equipment and work area are cleaned and inspected for serviceable condition according to workplace procedures
- Faulty equipment is identified, tagged and isolated according to workplace procedures
- Operator maintenance is completed according to manufacturer and component supplier specifications and site procedures
- Tools and equipment are maintained according to workplace procedures