Elements and Performance Criteria

  1. Prepare to undertake synchronising operations
  2. Conduct synchronising operations
  3. Analyse results
  4. Complete work processes
  5. Prepare to undertake synchronising operations
  6. Conduct synchronising operations
  7. Analyse results
  8. Complete work processes

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Safety and environmental requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

operating engines

following electrical safety requirements

isolating and stabilising plant and equipment

environmental requirements, including procedures for trapping, storing and disposing of oils or fluids released from plant and equipment during synchronisation process.


Performance Evidence

Before competency can be determined, individuals must demonstrate they can perform the following according to the standards defined in this unit’s elements, performance criteria, range of conditions and foundation skills:

synchronise two different pieces of plant and equipment, in which the work must involve:

selecting synchronising procedures appropriate to the circumstances

synchronising the plant and equipment

testing and inspecting synchronised plant and equipment.


Knowledge Evidence

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to synchronising plant and equipment, including procedures for:

operating engines

following electrical safety requirements

isolating and stabilising plant and equipment

environmental requirements, including procedures for trapping, storing and disposing of oils or fluids released from plant and equipment during synchronisation process

operating principles of plant and equipment and associated components, including:

electrical

hydraulic

mechanical

plant and equipment synchronisation procedures, including:

electrical:

connect and disconnect

electronic control module

electronic control of implement settings and adjustments

hydraulic:

connect and disconnect

pressure adjustment

fluid, leaks, and pressures

mechanical:

weight

power take-off (PTO)

three point linkage

towed implement

post-synchronisation testing procedures for plant and equipment, including operational test procedures.