Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to remove light vehicle engine assembly
  2. Remove engine assembly
  3. Install engine assembly
  4. Complete work processes
  5. Prepare to remove light vehicle engine assembly
  6. Remove engine assembly
  7. Install engine assembly
  8. Complete work processes

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Safety and environmental requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

using engine lifting devices and supporting equipment

handling oils, fuels and coolant

environmental requirements, including procedures for trapping, storing and disposing of oils, fluids, coolants and gases released from engine assemblies.

Post-installation checks, adjustments and tests must include:

pre-start procedures

operational testing and run-in procedures

engine adjustments and cylinder head bolt re-tensioning as required

throttle adjustments

coolant adjustments

ancillary engine systems.



Knowledge Evidence

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to removing and installing light vehicle engines, including procedures for:

using engine lifting devices and supporting equipment

handling oils, fuels and coolant

environmental requirements, including procedures for trapping, storing and disposing of oils, fluids, coolants and gases released from engine assemblies

licensing requirements relating to removing and installing engines fitted with alternative fuels and energy sources

methods of disconnecting related systems, including:

air conditioning system

cooling system

electrical systems

exhaust system

fuel system

power steering system

transmission systems, including:

automatic transmission

manual transmission

removal procedures for engine assemblies, including item tagging procedures

installation procedures for engine assemblies

post-installation testing and adjustment procedures for engine assemblies, including:

pre-start procedures

operational testing and run-in procedures

engine adjustments and cylinder head bolt re-tensioning as required

throttle adjustments

coolant adjustments

ancillary engine systems.