Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Prepare to service and repair post boring system
  2. Determine service and repair requirements of post boring system
  3. Carry out service and repair activities
  4. Check post boring system for normal operation
  5. Complete work processes
  6. Prepare to service and repair post boring system
  7. Determine service and repair requirements of post boring system
  8. Carry out service and repair activities
  9. Check post boring system for normal operation
  10. Complete work processes

Range Statement

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Service and repair procedures must include:

inspecting, repairing and replacing components

testing repaired unit, including overload protection.

Safety requirements must include:

work health and safety (WHS) and occupational health and safety (OHS) requirements, including procedures for:

safely starting and checking operation, adjustment and alignment of post boring system

safely operating overload system

selecting and using personal protective equipment (PPE).



Knowledge Evidence

Individuals must be able to demonstrate knowledge of:

work health and safety (WHS) and occupational health and safety (OHS) requirements relating to servicing and repairing post boring systems, including procedures for:

safely starting and checking operation, adjustment and alignment of post boring system

safely operating overload system

selecting and using personal protective equipment (PPE)

application, purpose and operation of stand-alone or chainsaw attached post boring systems, including:

petrol powered

electric powered

augers and drill bit types and their application

service and repair procedures for post boring systems, including:

drive system gearbox

overload devices

protective guards and cowlings

handle assembly

lubrication systems

chuck assembly

augers and drill bits

clutch drum assembly

reversing system

post-repair testing procedures, including operating system through full operating range.