Elements and Performance Criteria
- Prepare to install jet drive propulsion system
- Job requirements are determined from workplace instructions
- Installation procedures and information are sourced and interpreted
- Installation options are analysed and those most appropriate to the circumstances are selected
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Install and commission system
- System is checked for correct application and components are checked for damage
- System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
- Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements
- System is re-tested in normal operating conditions and final adjustments are made
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures
- Prepare to install jet drive propulsion system
- Job requirements are determined from workplace instructions
- Installation procedures and information are sourced and interpreted
- Installation options are analysed and those most appropriate to the circumstances are selected
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Install and commission system
- System is checked for correct application and components are checked for damage
- System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
- Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements
- System is re-tested in normal operating conditions and final adjustments are made
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures