Elements and Performance Criteria
- Prepare to overhaul air conditioning components
- Nature and scope of the work requirements are identified and confirmed
- OH&S requirements, including individual State/Territory regulatory/licensing requirements and personal protection needs are observed throughout the work
- Procedures and information such as workshop manuals, specifications and tooling, are sourced
- Method options are analysed and those most appropriate to the circumstances are selected and prepared
- Technical and/or calibration requirements for overhauling air conditioning components are sourced and support equipment is identified and prepared
- Hazards in relation to working with refrigerants are observed
- Awareness of proper decanting and disposal of ozone depleting substances are recognised
- Test air conditioning systems and analyse results
- Methods for the conduct of the system tests are implemented in accordance with workplace procedures and manufacturer/component supplier specifications
- Results are compared with manufacturer/component supplier specifications to indicate compliance or non-compliance
- Results are documented with evidence and supporting information and recommendation(s) made
- Report is processed in accordance with workplace procedures
- Overhaul air conditioning system components
- Information is accessed and interpreted from manufacturer/component supplier specifications
- Air conditioning system components are dismantled, reassembled and tested to manufacturer/component supplier specifications
- Worn, damaged, deteriorated or faulty components are identified and replaced/repaired
- Air conditioning system overhaul is completed without causing damage to any component or system
- System components are tested prior to placing into service and results are documented in accordance with enterprise policies and procedures
- Air conditioning system components are overhauled according to industry regulations/guidelines, OH&S legislation, legislation and enterprise procedures/policies
- Prepare air conditioning components and/or system for service or storage
- Work schedule documentation is completed
- Final inspection is made to ensure protective guards, safety features and cowlings are in place
- Final inspection is made to ensure work is to workplace expectations
- Air conditioning system/components are cleaned and/or stored to workplace expectations
- Job card is processed in accordance with workplace procedures