Elements and Performance Criteria
- Prepare for production of pattern or template
- Job requirements are determined from workplace instructions
- Size requirements are checked in relation to production process and finishing capacity of workplace
- Type and quantity of patterns and templates to be produced are identified and materials are obtained
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Plan process
- Material required for pattern or template is identified for approximate size and characteristics
- Required instruments and equipment are identified, located and assembled
- Drawings and related specifications are identified and interpreted
- Procedures for using pattern development instruments and tooling are confirmed, and equipment and tooling are prepared for use
- Plot dimensions
- Complete pattern or template
- Pattern or template is completed according to safety requirements and ensuring that it indicates completion date and original drawing details
- Required workplace approval of pattern or template is obtained
- Plans are marked with notations according to workplace procedures
- Plans are copied and filed according to workplace procedures
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and pattern or template is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures
- Prepare for production of pattern or template
- Job requirements are determined from workplace instructions
- Size requirements are checked in relation to production process and finishing capacity of workplace
- Type and quantity of patterns and templates to be produced are identified and materials are obtained
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Plan process
- Material required for pattern or template is identified for approximate size and characteristics
- Required instruments and equipment are identified, located and assembled
- Drawings and related specifications are identified and interpreted
- Procedures for using pattern development instruments and tooling are confirmed, and equipment and tooling are prepared for use
- Plot dimensions
- Complete pattern or template
- Pattern or template is completed according to safety requirements and ensuring that it indicates completion date and original drawing details
- Required workplace approval of pattern or template is obtained
- Plans are marked with notations according to workplace procedures
- Plans are copied and filed according to workplace procedures
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and pattern or template is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures