Elements and Performance Criteria
- Prepare to install hydraulic system
- Job requirements are determined from workplace instructions
- Hydraulic system installation procedures and information are sourced and interpreted
- Installation options are analysed and those most appropriate to the circumstances are selected
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Install hydraulic system
- System is checked for correct application and components are checked for damage
- System is installed according to manufacturer specifications, workplace procedures, and safety and environmental requirements, and without causing damage to components or systems
- Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures, and safety and environmental requirements
- System is re-tested in normal operating conditions and final adjustments are made
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and vehicle or system is presented ready for use, including ensuring that protective guards, safety features and cowlings are in place
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures
- Prepare to install hydraulic system
- Job requirements are determined from workplace instructions
- Hydraulic system installation procedures and information are sourced and interpreted
- Installation options are analysed and those most appropriate to the circumstances are selected
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Install hydraulic system
- System is checked for correct application and components are checked for damage
- System is installed according to manufacturer specifications, workplace procedures, and safety and environmental requirements, and without causing damage to components or systems
- Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures, and safety and environmental requirements
- System is re-tested in normal operating conditions and final adjustments are made
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and vehicle or system is presented ready for use, including ensuring that protective guards, safety features and cowlings are in place
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures