Elements and Performance Criteria
- Prepare to install electrical control equipment
- Job requirements are determined from workplace instructions
- Electrical control equipment installation information is sourced and interpreted
- Installation options are analysed and those most appropriate to the circumstances are selected
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Install electrical control equipment
- Electrical control equipment is checked for correct application and components are checked for damage
- Electrical control equipment components are installed according to workplace procedures, manufacturer specifications, safety and environmental requirements and relevant Australian standards, and without causing damage to components or systems
- Installed electrical control equipment is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures, safety requirements, and relevant Australian standards
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and system is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures
- Prepare to install electrical control equipment
- Job requirements are determined from workplace instructions
- Electrical control equipment installation information is sourced and interpreted
- Installation options are analysed and those most appropriate to the circumstances are selected
- Hazards associated with the work are identified and risks are managed
- Tools, equipment and materials are selected and checked for serviceability
- Install electrical control equipment
- Electrical control equipment is checked for correct application and components are checked for damage
- Electrical control equipment components are installed according to workplace procedures, manufacturer specifications, safety and environmental requirements and relevant Australian standards, and without causing damage to components or systems
- Installed electrical control equipment is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures, safety requirements, and relevant Australian standards
- Complete work processes
- Final inspection is made to ensure work is to workplace expectations and system is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
- Tools and equipment are checked and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures