Elements and Performance Criteria
- Prepare for work
- Work instructions are used to determine job requirements, including method, material and equipment.
- Job specifications are read and interpreted.
- OHS requirements, including dust and fume collection, breathing apparatus, eye and ear personal protection needs are observed throughout the work.
- Materials for use are selected.
- Equipment and tooling are identified and checked for safe and effective operation.
- Procedures are determined to minimise waste material.
- Procedures are identified for maximising energy efficiency while completing the job.
- Measure and cut tinting material/template
- Information is accessed from manufacturer/component supplier specifications and interpreted.
- Measurement, cutting and template production are performed according to accepted industry methods, materials and procedures.
- Surfaces are measured, and materials and templates are cut without causing damage to component or system.
- Workplace documentation is completed and dealt with relevant to measuring and cutting outcomes.
- Measurement, cutting and template production are to be carried out according to industry regulations/guidelines, OH&S requirements, legislation and enterprise procedures/policies.
- Prepare surfaces and apply window tinting material
- Information required for surface preparation and tinting is accessed from manufacturer/component supplier specifications and interpreted.
- Surface preparation is carried out using approved methods, materials and equipment, according to the specifications of the tinting material to be applied.
- Window tinting material is applied according to manufacturer/component supplier specifications and tolerances.
- Tinting applications are inspected and tested in accordance with authorised procedures prior to placing into service.
- Work is completed without causing damage to component or system.
- Surface preparations and tinting applications are carried out according to industry regulations/guidelines, OHS requirements, legislation and enterprise procedures/policies.
- Workplace documentation is completed and dealt with relevant to the tinting outcomes.
- Store window tinting material
- Information relating to storage is accessed and interpreted from manufacturer/component supplier specifications.
- Window tinting material is stored without causing damage to component or system.
- Storage is carried out according to industry regulations/guidelines, OHS requirements, legislation and enterprise procedures/policies.
- Workplace documentation is completed and dealt with relevant to material storage outcomes.
- Clean up work area and maintain equipment
- Material that can be reused is collected and stored.
- Waste and scrap are removed following workplace and environmental procedures.
- Equipment and work area are cleaned and inspected for serviceable condition in accordance with workplace procedures.
- Unserviceable equipment is tagged and faults identified in accordance with workplace requirements.
- Operator maintenance is completed in accordance with manufacturer/component supplier specifications and worksite procedures.
- Tooling is maintained in accordance with workplace procedures.