Elements and Performance Criteria
- Prepare for non-structural panel repairs
- Job requirements are determined from workplace instructions
- Workplace procedures and product manufacturer and original equipment manufacturer (OEM) specifications are sourced and interpreted
- Hazards associated with the work are identified and risks are managed
- Equipment and hand and power tools are selected and checked for serviceability
- Work is planned to minimise waste according to workplace procedures
- Carry out non-structural panel repairs to pre-paint condition
- Panels are repaired using approved repair methods, materials and equipment according to OEM specifications and safety and environmental requirements
- Repairs are finished to pre-paint condition according to workplace procedures
- Advice is sought from appropriate personnel if repair interferes with the vehicle’s trim or electrical and mechanical systems
- Complete work processes
- Final inspection is made to ensure work meets workplace expectations and panel is presented ready for painting
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
- Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures
- Prepare for non-structural panel repairs
- Job requirements are determined from workplace instructions
- Workplace procedures and product manufacturer and original equipment manufacturer (OEM) specifications are sourced and interpreted
- Hazards associated with the work are identified and risks are managed
- Equipment and hand and power tools are selected and checked for serviceability
- Work is planned to minimise waste according to workplace procedures
- Carry out non-structural panel repairs to pre-paint condition
- Panels are repaired using approved repair methods, materials and equipment according to OEM specifications and safety and environmental requirements
- Repairs are finished to pre-paint condition according to workplace procedures
- Advice is sought from appropriate personnel if repair interferes with the vehicle’s trim or electrical and mechanical systems
- Complete work processes
- Final inspection is made to ensure work meets workplace expectations and panel is presented ready for painting
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
- Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures