Elements and Performance Criteria
- Prepare for work
- Job requirements are determined from workplace instructions
- Set-up information is sourced and interpreted
- Hazards associated with the work are identified and risks are managed
- Painting equipment and personal protective equipment (PPE) are selected and checked for serviceability
- Work is planned to identify spray painting methods, minimise waste, and use time efficiently
- Set up spray painting equipment ready for use
- Spray guns are set up, tested and maintained according to manufacturer instructions, workplace procedures, and safety and environmental requirements
- Paint mixing system and paint agitators are set up and checked for serviceability, according to equipment manufacturer specification
- Paint drying systems are set up and inspected for correct operation according to workplace procedures
- Pressure regulators and air lines are checked according to workplace procedures
- Complete work processes
- Final inspection is made to ensure work meets workplace expectations and equipment is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
- Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures
- Prepare for work
- Job requirements are determined from workplace instructions
- Set-up information is sourced and interpreted
- Hazards associated with the work are identified and risks are managed
- Painting equipment and personal protective equipment (PPE) are selected and checked for serviceability
- Work is planned to identify spray painting methods, minimise waste, and use time efficiently
- Set up spray painting equipment ready for use
- Spray guns are set up, tested and maintained according to manufacturer instructions, workplace procedures, and safety and environmental requirements
- Paint mixing system and paint agitators are set up and checked for serviceability, according to equipment manufacturer specification
- Paint drying systems are set up and inspected for correct operation according to workplace procedures
- Pressure regulators and air lines are checked according to workplace procedures
- Complete work processes
- Final inspection is made to ensure work meets workplace expectations and equipment is presented ready for use
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored
- Tools and equipment are checked, reported if faulty, and stored according to workplace procedures
- Workplace documentation is processed according to workplace procedures