Elements and Performance Criteria
- Prepare body panel for priming
- Tools, equipment and materials for priming body panel are selected and checked prior to use according to manufacturer specifications and safety requirements
- Vehicle body panel is prepared for priming according toworkplace procedures and safety and environmental requirements, and without causing damage to components, tools or equipment
- Body panel is inspected according to manufacturer specifications
- Body panel inspection results are recorded
- Apply primer to body panel
- Primer is prepared for application according to manufacturer specifications and safety and environmental requirements
- Primer is applied according to workplace procedures, manufacturer specifications, and safety and environmental requirements
- Primer is applied to body panel without causing damage to body panel, components, tools or equipment
- Body panel is inspected to ensure correct application of primer to body panel
- Body panel inspection results are recorded
- Complete work processes
- Final inspection is made to ensure work meets task instruction and workplace standards, and body panels are primed ready for use or storage according to workplace procedures
- Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected and stored according to environmental requirements and workplace procedures
- Tools and equipment are checked and stored according to workplace procedures, or tagged and reported where necessary
- Workplace documentation is processed according to workplace procedures
- Prepare to prime a repaired body panel
- Safety and environmental requirements are sourced and interpreted
- Task instruction is interpreted and vehicle body panel to be worked on is identified
- Manufacturer specifications and workplace procedures for removing paint and preparing surface are sourced and interpreted
- Potential hazards and risks associated with task are identified and reported to workplace supervisor
- Tools and equipment required for priming body panel are identified according to manufacturer specifications