|
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. |
Access and egress may include: | appropriate and safe entry to simulator in accordance with organisation's OH&S and security policiesappropriate and safe exit methodologies from simulatorsinterpretation of signage, safety warnings and simulator statusmonitoring access of visitors to simulator and providing safety/security briefs as required |
Simulator may include | full motion simulatorflight training devicesynthetic training devicevirtual reality training systemsingle, multiple or team operator simulatorsimulatorpart-task simulatordesktop simulatoroperating systemassociated simulator computer hardware and software |
Workplace procedures may include: | company proceduresenterprise proceduresorganisational proceduresstandard operating proceduresmanufacturers guidelinesestablished proceduresworkplace instructions |
Motion system may include: | a system that provides motion cues, where fitted, and associated safety practicessystem safety requirementslocation and operation of emergency stop buttons, and resetting of buttons |
Safety and emergency may include: | simulation sicknessequipment malfunction/failuresmoke or overheat warningsemergency communicationloading stopsmotion stops |
Safety and emergency procedures may include: | established proceduresindustry safe practice |
Monitoring simulator serviceability may include: | ensuring device is maintained to a level satisfactory to comply with organisational requirementsrecording issues which may arise during the course of routine equipment operationsubmission of routine maintenance documentation |
Simulation sickness may include: | visuomotor dysfunctionsmental disorientationnausea including vomitingother symptoms such as drowsiness, fatigue, and headache |
Workplace communications may include: | interpersonal communicationsmessages received via simulator/simulated communicationson-screen messageswritten reportsphoneradioother information communication technology means (e.g. email, SMS, blogs, text message, facsimile) |
Information communication technology equipment may include: | visual display unitslesson planning and other off-line preparation stationselectronic communication devices (e.g. desktops, laptops, notebooks, PDAs, cameras, visual monitoring systems) |
Pre-operation planning may include: | use of pre-operation planning toolsdevelopment of simulation activity plandiscussion |
Appropriate simulation equipment may include: | computer software subclasssoftware applicationssynthetic environment software (e.g. SETHI)gaming softwaredigital insertion devicescompact discsuniversal serial bus devicesaccess databaseweb based databasestorage strategy within an organisation's databasespersonnel equipment (e.g. hearing protection, eye protection, clothing, footwear) |
Simulation activities may include: | scenariospre-planned training sortiespre-planned training operations |
Operating manuals may include: | manufacturer information manualsorganisation operations manualsdrop-down menus within software applicationsa system troubleshooting capability |
Accessed may include: | downloading from databaseopening applications, directories and filesinserting a digital storage device |
Work practices may include: | operations conducted by training staffoperations conducted by simulator operatorsscenarios utilised to support a simulated activity |
Data may include: | scenario contentrepresentations of facts, concepts and instructions |
Saved may include: | information sent to storage within an organisation's databaseinformation sent to storage within an internal hard driveinformation sent to storage within an external hard drive |
Stored may include: | information retained within an organisation's databaseinformation retained within an internal hard driveinformation retained within an external hard drive |
Relevant personnel may include: | Instructional staffcoaching staffexperienced personnelsubject matter experts (e.g. pilots, aircrew)technical stafftraineesother simulator operators |
Simulation activity plan may include: | written or electronic variable or set scenariosguidance and control within a range of pre-programmed characteristicsinformation which may be saved on a digital storage devicea pre-programmed range of variablesprogramming of entities into a simulator activitygeophysical conditions |
Abnormal/unusual conditions may include: | hardware malfunction/failuresoftware malfunction/failuresimulation sicknesspoor/unusual participant performancepersonnel equipment malfunction/failure |
Variations to activity conditions may include: | changes made in response to a training needchanges made in response to a strategic requirement |
Debrief may include: | providing feedback to relevant personnel on conclusion of simulator activityproviding feedback to relevant organisational authoritiesproviding feedback to manufacturers, contracted suppliers, and contracted maintainers |