Elements and Performance Criteria
- Carry out pre-take-off procedures
- Take off aeroplane
- Take-off power is applied, aeroplane is maintained aligned with centre of runway with wings maintained level and rotated at manufacturers recommended speed to achieve planned climb performance
- Aeroplane is configured for nominated climb profile, and tracking on centreline of runway is maintained
- Lookout is maintained using a systematic scan technique at a rate determined by traffic density, visibility and terrain
- Separation with all circuit traffic is maintained
- Radiotelephone listening watch is maintained
- Local and published noise abatement requirements and curfews are observed
- After take-off checks are performed in accordance with approved checklist
- Perform rejected take-off