Elements and Performance Criteria
- Prepare for IMC arrival
- Conduct IMC arrival to instrument approach point
- Ground track is maintained to ensure that the subsequent instrument approach or traffic pattern can be flown, taking into account any obstructions and Air Traffic Control (ATC) instructions
- Obstacle clearance minima are maintained IAW AIP and/or ATC instructions
- Existing wind conditions are verified making corrections for drift to maintain a precise ground track
- Stabilised approach is maintained with the specified airspeed and rate of descent tolerances
- Approach point intercepted IAW AIP requirements for commencing selected instrument approach