Required Skills
Evidence Required
It is essential that competence is observed in the following aspects
communicate effectively to enable accurate calculations and measurements
demonstrate effective use of measuring devices
accurate measurements taken and recorded
perform simple calculations to specifications
estimate quantities and costs to requirements
Prerequisite Relationship of Units
Underpinning Knowledge and Skills
materials relevant to the construction process
basic operations in simple geometry measurement and calculations
costing relative to the construction process
measure and calculate manually
operate electronic calculating devices
The following resources should be made available
information on construction materials appropriate to the relevant construction process
suitable work area appropriate to the activity
suitable site plansdrawings andor specifications
measuring and calculating devices
Competency in this unit may be determined concurrently based upon integrated project work
It is essential that competence is observed in the following aspects
communicate effectively to enable accurate calculations and measurements
demonstrate effective use of measuring devices
accurate measurements taken and recorded
perform simple calculations to specifications
estimate quantities and costs to requirements
Prerequisite Relationship of Units
Underpinning Knowledge and Skills
materials relevant to the construction process
basic operations in simple geometry measurement and calculations
costing relative to the construction process
measure and calculate manually
operate electronic calculating devices
The following resources should be made available
information on construction materials appropriate to the relevant construction process
suitable work area appropriate to the activity
suitable site plansdrawings andor specifications
measuring and calculating devices
Competency in this unit may be determined concurrently based upon integrated project work
Range Statement
This unit applies to simple projects applicable to:
timber frames structural steelwork concrete brick/block work joinery tiling sheeting/panelling plastering final finishes fences formwork excavation workMaterials include all materials utilised in construction of commercial, industrial/domestic and civil construction projects, including hardware items.Calculations to include: area perimeter volume mass scales ratios (ingredients/elements and triangulation)Job instruction may involve: verbal direction/instruction written instruction provision of job drawing and detailsThis unit applies to simple projects applicable to: timber frames structural steelwork concrete brick/block work joinery tiling sheeting/panelling plastering final finishes fences formwork excavation workMaterials include all materials utilised in construction of commercial, industrial/domestic and civil construction projects, including hardware items.Calculations to include: area perimeter volume mass scales ratios (ingredients/elements and triangulation)Job instruction may involve: verbal direction/instruction written instruction provision of job drawing and details