Elements and Performance Criteria
- Access and interpret relevant code and standard requirements.
- Relevant performance requirements from the BCA that apply to individual projects (described as low rise) are identified.
- Requirements of relevant BCA deemed-to-satisfy (DTS) provisions are determined.
- Requirements of relevant Australian standards referenced in the BCA are accessed and interpreted accordingly.
- Classify buildings.
- Analyse and apply a range of solutions to a construction problem for compliance with the BCA.
- Range of criteria that will ensure that construction methods comply with BCA performance requirements is determined.
- Alternative solutions to a design or construction problem that will comply with BCA requirements are discussed and proposed in accordance with company policies and procedures.
- Performance-based solutions are identified and documented in accordance with BCA requirements.
- Assessment methods referenced in the BCA to determine whether a building solution complies with performance requirements or DTS provision of the BCA are analysed and applied.
- Relevant documentation is identified and completed in accordance with BCA requirements.
- Apply fire protection requirements.
- Passive and active fire control elements for low rise building required by the BCA and other legislation are identified and applied.
- Level of fire resistance required for the construction of various low rise buildings is determined.
- Check of existing buildings for compliance with passive and active fire protection requirements is carried out in accordance with BCA requirements.