Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Read and interpret plans and specifications.
  2. Identify and calculate labour costs.
  3. Identify and establish physical resource requirements.
  4. Develop estimated project costs.

Required Skills

Required skills

Required skills for this unit are

communication skills to

enable clear and direct communication using questioning to identify and confirm requirements share information listen and understand

read and interpret drawings and specifications

use language and concepts appropriate to cultural differences

use and interpret nonverbal communication

contractual arrangement problem solving

estimate labour and materials costs from written information

numeracy skills to calculate labour hours and costs material quantities and costs

use appropriate costing software programs

Required knowledge

Required knowledge for this unit is

how to access and interpret

national codes including Building Code of Australia BCA and the Plumbing Code of Australia

Australian standards relevant to the industry sector

includes state or territory and local government building and construction codes standards and government regulations relevant to the form of building or construction being undertaken eg WorkCover and EPA

types of building and construction drawings and specifications

types scope and usage of labour through the employee and subcontractor systems

operation and structure of the organisations costing and contracting system

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

This unit of competency could be assessed by the preparation of a detailed estimate of labour materials and other project costs as part of the preparation of a tender or bill for a residential or commercial construction project relevant to the specific trade or sector

This unit of competency can be assessed in the workplace or a close simulation of the workplace environment provided that simulated or projectbased assessment techniques fully replicate construction workplace conditions materials activities responsibilities and procedures

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to

identify materials required for a project

gather information about material supply

interpret measurements and calculate quantities and costs

plan and allocate human resources

identify and cost other related costs such as those required to meet statutory and planning approval processes

produce documentation that meets the timeframes and quality standards established by the organisation

communicate effectively both verbally and in writing

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices safety requirements and environmental constraints

Assessment of essential underpinning knowledge will usually be conducted in an offsite context

Assessment is to comply with relevant regulatory or Australian standards requirements

Resource implications for assessment include

documentation that should normally be available in either a building or construction office

relevant codes standards and government regulations

office equipment including calculators photocopiers and telephone systems

computers with appropriate software to view D CAD drawings run costing programs and print copies

a technical reference library with current publications on measurement design building construction and manufacturers product literature

a suitable work area appropriate to the construction process

Reasonable adjustments for people with disabilities must be made to assessment processes where required This could include access to modified equipment and other physical resources and the provision of appropriate assessment support

Method of assessment

Assessment methods must

satisfy the endorsed Assessment Guidelines of the Construction Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments

Validity and sufficiency of evidence requires that

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the persons demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct indirect and supplementary evidence

Assessment processes and techniques should as far as is practical take into account the language literacy and numeracy capacity of the candidate in relation to the competency being assessed

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties such as existing supervisors team leaders or specialist training staff


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Plans and specifications include:

building codes

materials lists and quantity schedules

materials specifications

sketches or drawings

statements of requirements.

Plant or equipment requirements include:

communications equipment

conveyors

heavy equipment, such as wheeled and tracked earthmoving equipment, trucks and articulated vehicles

hoists

mobile and tower cranes

on-site equipment, such as:

compressors

pumps

generators

portable lighting

lifting equipment

portable compaction equipment.

Unit costs may include the cost of:

construction cost per square metre

installation of pipes per metre

installation of sanitary ware per unit

laying of foundation per metre

laying of slabs per square metre

laying of steel tray roofing per square metre

masonry walls per square metre

painting per square metre

tiling per square metre.

Project costs include:

building or construction materials

communications costs

cost of meeting statutory requirements, e.g. EPA

fuels, lubricants and consumables

organisational and subcontract labour hours

overheads

project administration costs

site facilities, such as:

offices

toilets

lunch rooms

waste removal fees.