Google Links

Follow the links below to find material targeted to the unit's elements, performance criteria, required skills and knowledge

Elements and Performance Criteria

  1. Appraise the contractual documentation and delegate the planning of operational requirements as necessary.
  2. Initiate strategies and delegate the implementation of medium rise construction operations, as necessary.
  3. Supervise the preparation of project schedules.
  4. Ensure the provision of all resources required for project.
  5. Review existing on-site buildings or structures.
  6. Supervise staff and maintain an effective work environment.

Required Skills

Required skills

Required skills for this unit are

evaluation skills to review and evaluate documentation and processes and recommend changes or improvements

communication skills to

enable clear and direct communication using questioning to identify and confirm requirements share information listen and understand

discuss problems with consultants

manage staff

read and interpret

contracts project schedule and reports

documentation from a variety of sources

use and interpret nonverbal communication

use language and concepts appropriate to cultural differences

written skills to

document project schedule and resource requirements

maintain records

record relevant information

management skills including the ability to delegate tasks and supervise staff to achieve planning outcomes

planning skills to enable the effective planning of projects processes and strategies which maximise the efficiency and costeffectiveness of building or construction contracts and which effectively organise and use available resources on construction sites

Required knowledge

Required knowledge for this unit is

building and construction industry contracts

building and construction industry subcontracting system

building or construction practices in on and offsite management

construction planning process

contract documentation quantities establishment rates and costs related to payments and claims

human resource principles and practices

relevant licensing arrangements

relevant state or territory building and construction codes standards and government regulations for medium rise building projects

workplace safety requirements

Evidence Required

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria required skills and knowledge range statement and the Assessment Guidelines for the Training Package

Overview of assessment

This unit of competency could be assessed by the demonstration of effective supervision of planning onsite building or construction work

This unit of competency can be assessed in the workplace or a close simulation of the workplace environment provided that simulated or projectbased assessment techniques fully replicate construction workplace conditions materials activities responsibilities and procedures

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to

translate contract requirements into construction plans and processes

delegate planning tasks

apply construction planning processes that effect desired outcomes

development strategies that effectively maximise resource use

establish and maintain a workplace environment representative of good management practice

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices safety requirements and environmental constraints

Assessment of essential underpinning knowledge will usually be conducted in an offsite context

Assessment is to comply with relevant regulatory or Australian standards requirements

Resource implications for assessment include

available in either a building or construction office

relevant codes standards and regulations

office equipment including calculators photocopiers and telephone systems

computers with appropriate software to view D CAD drawings run costing programs and print copies

a technical reference library with current publications on measurement design building construction and manufacturers product literature

a suitable work area appropriate to the process

Reasonable adjustments for people with disabilities must be made to assessment processes where required This could include access to modified equipment and other physical resources and the provision of appropriate assessment support

Method of assessment

Assessment methods must

satisfy the endorsed Assessment Guidelines of the Construction Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments

Validity and sufficiency of evidence requires that

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice with a decision on competency only taken at the point when the assessor has complete confidence in the persons demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct indirect and supplementary evidence

Assessment processes and techniques should as far as is practical take into account the language literacy and numeracy capacity of the candidate in relation to the competency being assessed

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties such as existing supervisors team leaders or specialist training staff


Range Statement

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Contracts include:

Australian standard contracts, including the AS2124 and AS4000 series

Construction Industry Contract (CIC) suite

individual organisational contracts

Joint Contracts Committee (JCC) suite

MBA and HIA contracts

Simple Building Works (SBW), including series 1 and series 2 (SBW2 Lump Sum).

Resources include:

human resources, both organisational and subcontracted

on-site facilities

plant and equipment

power, water, telephone and other resources

pre-cut or pre-cast components

raw materials

temporary accommodation.

Project schedule includes:

critical events and milestones

labour supply and availability information

materials supply and availability information

plant and equipment availability information

services provision

subcontractor requirements and availability.

Temporary services include:

offices and crib rooms

on-site communications

portable generators and lighting

power poles

toilets.