Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application including required fire resistance rating are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
- Passive and active fire control elements for eaves construction are identified and applied.
- Install fascia and barge.
- Construct framework for eaves or soffits.
- Framework structure for eaves type are identified, and eaves design is established and set out to drawings and specifications.
- Timber framework members are set out, marked and cut to lengths in accordance with methods of joining and proposed framework structure.
- Boxed eaves constructed with soffit bearers are fixed to wall frame or supported by hangers from rafters, to line and level.
- Boxed eaves structure is installed, clear of top of masonry walls in veneer construction to allow for frame shrinkage and settlement.
- Eaves structure members are securely fixed, including back blocking and trimmers.
- Line and clad eaves and soffits.
- Eaves cladding and sheeting material is marked and cut to shape to suit task application and jointing methods.
- Eaves lining, cladding and sheeting are fitted, joined and fixed in accordance with type of material, task application and specifications.
- Mouldings are fitted and fixed to specifications to finish eaves.
- Sloping eaves are fitted to underside of rafters or framing for fixing and joining of material.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.