Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied using relevant information for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
- Install window units to frame.
- Window opening size is checked to be greater than overall window frame.
- Reveals are joined and fixed securely to frames where specified.
- Window unit is located to suit brickwork and eaves finish for veneer construction, whichever is applicable.
- Window unit is positioned in place so that head/sill are level and stiles are plumb and in wind, ensuring reveals or frame are finished flush with face of inside wall lining.
- Window is packed and fixed to wall frame through/to studs, in accordance with specified fixing and fastening methods.
- Replace window units/door frames.
- Architraves and nosing are removed.
- Sill bricks or cladding are removed where specified.
- Fasteners are cut, packing removed and flashing detached from frame.
- Window unit/ door frame is removed.
- Window unit/door frame and window components are installed to plumb, level and wind.
- Architraves and mouldings are replaced.
- Prepare door opening, and construct and fix jamb.
- Door frame opening size is checked to be greater than the overall door jamb width and height, allowing for plumbing of stiles, thickness of floor covering, levelling of door head and level of floor.
- Jamb stiles are marked and cut to length allowing for clearances according to specifications.
- Head is trenched to accommodate jamb stiles allowing for clearance according to specification.
- Jamb frame is assembled, squared and braced with rebates flush.
- Joints and rebates are cleaned and finished to quality requirements.
- Install door and door unit.
- Door unit is positioned in place so that the head/sill is level and stiles are plumb and in wind, ensuring reveals or frame finished flush with face of inside wall lining.
- Door is fitted to jamb allowing for clearances according to specifications with lock stile door backed off to facilitate correct operation.
- Hinges are marked out on door and jamb.
- Hinges are fitted to door and jamb.
- Final adjustments of door are made.
- Door furniture components are fitted and fixed to manufacturer specifications.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.