Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment selected to carry out wet area framing and fitting out are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
- Set out wet area installation.
- Prepare for bath installation.
- Studs are checked to height and level for required depth to receive lip of bath.
- Support to front edge of bath is constructed to height and level.
- Nogging and short studs are fixed and fitted, where specified, flush to wall face for fixing surround sheeting.
- Sheeting and flashing are fixed to specifications.
- Prepare for shower base installation.
- Location of shower base is set out.
- Wall plates and studs are checked out to required depth to receive shower base.
- Nogging and short studs are fitted and fixed flush to wall face for fixing surround sheeting.
- Corner flashing is installed to regulations.
- Flashing and sheeting are fitted and fixed to specifications.
- Prepare for sink installation.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.