Elements and Performance Criteria
- Plan and prepare.
- Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes.
- Safety (OHS) requirements are followed in accordance with safety plans and policies.
- Signage and barricade requirements are identified and implemented.
- Plant, tools and equipment selected to carry out lining and moulding installation tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
- Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
- Prepare surface for lining/panelling.
- Install lining/panelling.
- Cut and fix standard architrave mouldings.
- Standard architraves for edging are marked, cut to length, positioned and fitted to specifications.
- Skirtings are marked, cut to length, positioned and fitted to specifications.
- Mitre joints are fitted flush to face and true without gaps.
- Scribed joints are marked, cut to length, positioned and fitted to specifications.
- Scotia return end is cut to profile shape and length as detailed for location in drawings and specifications.
- Standard pelmet moulding sections are marked to length, cut, fitted and assembled and fixed to specifications with mitres true without gaps.
- Raked moulding is set out to position and mould is shaped to pattern for each position.
- Clean up.
- Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.